5.0 (1)
In Stock
EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)
Keyboards Original & Verified

EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) (EVM-WDKM-315)

₹1,390 16% Off
₹1,650 MRP • Save ₹260

Quality Guarantee & Support

7-Day Replacement Policy • 100% Brand Authentic Product

Overview

EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White) EVM EnHawk 7B23 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like multi-color LED modes, 19-key anti-ghosting with a 6 button mouse that has adjustable 3600DPI settings for precise con...

1

Technical Specifications

Verified Specs
Model EnHawk 7B23 Wired Keyboard & Mouse Combo SKU EVM-WDKM-315 Keyboard Key 104 Backlit Lighting Multicolor LED
Interface USB Mouse Button 6 DPI 3600
Color White
Warranty 1 Year
Note ***
Features , Price, Specifications are subject to change without notice.

Full Product Details

Description

EVM EnHawk 7B23 Gaming Keyboard and Mouse Combo (White)

EVM EnHawk 7B23 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like multi-color LED modes, 19-key anti-ghosting with a 6 button mouse that has adjustable 3600DPI settings for precise control.

Features:

  • 104 Keys Gaming Keyboard
  • Size: 430.7*131*30 mm, N.W.: 439g
  • PU Cable: 1.5 meters, Factory standard USB
  • Key: 104 keys
  • Multi media FN Function: FN+F1-F12
  • Backlight: multi-color LED modes, can be switch
  • 19 keys anti-ghosting
  • Color: Silk print keycaps, Injection White and blue E key
  • Gaming mouse
  • 6 Buttons, DPI 1200-1800-2400-3600;
  • Size:126*66*39mm
  • Pu cable length:1.5meter
  • Factory standard USB, Silk print grey logo, and text

Specification:

Model EnHawk 7B23 Wired Keyboard & Mouse Combo
SKU EVM-WDKM-315
Keyboard Key 104
Backlit Lighting Multicolor LED
Interface USB
Mouse Button 6
DPI 3600
Color White
Warranty 1 Year
Note *** Features, Price, Specifications are subject to change without notice.


Additional information

brand

Customer Reviews

5.0 / 5.0
V
Vasu Pathak Verified Buyer
1 year ago

Rated 5 out of 5 Vasu Pathak (verified owner) – January 21, 2025 Came very well packed