5.0 (1)
In Stock
EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)
Keyboards Original & Verified

EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) (WDKM-612-SILVER-WHITE)

₹1,550 16% Off
₹1,850 MRP • Save ₹300

Quality Guarantee & Support

7-Day Replacement Policy • 100% Brand Authentic Product

Overview

EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White) EVM EnClaw 9027 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like RGB backlighting, 19-key anti-ghosting with a 6 button mouse that has adjustable 7200DPI settings for precise control.

1

Technical Specifications

Verified Specs
Model EnClaw 9027 Wired Keyboard & Mouse Combo SKU EVM-WDKM-612 Keyboard Key 104 Backlit Lighting Multicolor RGB
Interface USB Mouse Button 6 DPI 7200
Color White
Warranty 1 Year
Note ***
Features , Price, Specifications are subject to change without notice.

Full Product Details

Description

EVM EnClaw 9027 Gaming Keyboard and Mouse Combo (White)

EVM EnClaw 9027 Wired Keyboard & Mouse Combo is perfect for gamers seeking high-performance features like RGB backlighting, 19-key anti-ghosting with a 6 button mouse that has adjustable 7200DPI settings for precise control.

Features:

  • Gaming keyboard
  • 104 Keys,Silver Metal Plate
  • Cable :1.5 m Braided cable
  • Gold plated USB
  • Multi media FN Function: FN+F1-F12
  • Backlight: RGB multil color led modes,can be switched
  • Silk print key caps with Injection blue E key ,
  • PVC gasket for metal holes
  • 19 keys anti-ghosting
  • Gaming mouse
  • Buttons:6
  • Cable length:1.5m braided cable ,Gold plated USB
  • Rainbow luminous, rubber oil coated, radium carving LOGO and Text
  • DPI: 1200-2400-4800-7200(with Macro function)

Specification:

Model EnClaw 9027 Wired Keyboard & Mouse Combo
SKU EVM-WDKM-612
Keyboard Key 104
Backlit Lighting Multicolor RGB
Interface USB
Mouse Button 6
DPI 7200
Color White
Warranty 1 Year
Note *** Features, Price, Specifications are subject to change without notice.


Additional information

brand

Customer Reviews

5.0 / 5.0
V
Vasu Pathak Verified Buyer
1 year ago

Rated 5 out of 5 Vasu Pathak (verified owner) – January 21, 2025 Came very well packed